Filter configuration
Posted: Thu Feb 19, 2009 5:11 pm
Hi everyone
I keep changing what's left of my mind about the filter configuration for my growing on pond. This means that I spend a lot of time looking at it and no time building the plinths to stand the filters on and sorting out the pipework. I wonder if anyone can help me with the following conundrum;
Pond is 1,800 gal with one Spindrifter bottom drain and a skimmer with 4" pipework. The kit I have available is;
1 Cloverleaf CL3 multichamber filter
2 x RTF upflow filter chambers
1 24" vortex
4 tier shower
My plan at the moment is;
From the bottom drain - to use the vortex as primary settlement followed by the CL3. First chamber as static K1, second as fluid k1, third Jap matting and 4th as either empty for adding treatment e.g. oyster shell for buffering) or more K1/Jap matting. Pumped by a Aquamax 10,000 giving roughly pond turnover once per hour
From skimmer - pass through 3KW elecro heater, then over shower (ultimately 50Kg of BHM, but initially 20 Kg of BHM in top 2 trays with flocor/K1/K3 in the rest). Pump Sequence 12000, giving approx turnover of 1 1/2 pond turnover per hour.
Can anyone improve on any aspect of the above?
Thanks
Jon
I keep changing what's left of my mind about the filter configuration for my growing on pond. This means that I spend a lot of time looking at it and no time building the plinths to stand the filters on and sorting out the pipework. I wonder if anyone can help me with the following conundrum;
Pond is 1,800 gal with one Spindrifter bottom drain and a skimmer with 4" pipework. The kit I have available is;
1 Cloverleaf CL3 multichamber filter
2 x RTF upflow filter chambers
1 24" vortex
4 tier shower
My plan at the moment is;
From the bottom drain - to use the vortex as primary settlement followed by the CL3. First chamber as static K1, second as fluid k1, third Jap matting and 4th as either empty for adding treatment e.g. oyster shell for buffering) or more K1/Jap matting. Pumped by a Aquamax 10,000 giving roughly pond turnover once per hour
From skimmer - pass through 3KW elecro heater, then over shower (ultimately 50Kg of BHM, but initially 20 Kg of BHM in top 2 trays with flocor/K1/K3 in the rest). Pump Sequence 12000, giving approx turnover of 1 1/2 pond turnover per hour.
Can anyone improve on any aspect of the above?
Thanks
Jon