Good day today, made some positive progress:
- Fibre glassed in a new bottom drain pipe to the existing pipes
- Built the side wall up where the old Vortex side was
- Cleared up the bottom of the whole area, chipped off all the high spots and swept it all
- Fitted hoover pipe through the wall
- Rendered the walls - this went well, I must be improving!
This is what it looks like now
[img]http
://www.koipix.com/gallery/albums/userpi ... CN4025.JPG[/img]
Tomorrow I'll fit a membrane, then screed the floor with sharp sand/cement mix. Hoping to get that with a good finish to save having to render it - depends how well I do it!
Lots of bits and bobs to do though, prior to glassing it perhaps Friday or Sunday.